Hydro-Brake® flow control specified to relieve Yorkshire flooding
Friday, 26 February 2010
ImageHydro International’s Hydro-Brake® Flow Controls have been installed into a new dam, near Devil’s Bridge, on the Blackburn Brook, just outside Sheffield.

Hydro International’s Hydro-Brake® Flow Controls have been installed into a new dam, near Devil’s Bridge, on the Blackburn Brook, just outside Sheffield. JBA Consulting specified two of the large flow control devices to reduce the risk of flooding on the nearby Thorncliffe Industrial Estate, and surrounding residential areas.

The Blackburn Brook runs through a 500 m long culvert beneath the Thorncliffe Industrial Estate. The small weir, situated on the brook, creates a holding capacity of just 4000 cu.m; this isn’t large enough to provide protection from flooding.  As a result, the industrial estate and nearby housing have suffered flood damage and disruption.  A dam, creating a potential storage capacity of 32,000 cu.m, is therefore being constructed, approximately 300 m upstream of the culvert, to alleviate this.

Image

 

João Santa-Clara, consulting engineer, JBA Consulting, commented:

“The area suffered from extensive flooding in 2007, due to a 150 year storm event, which exceeded the capacity of a culvert on the local Blackburn Brook. The flood caused a great deal of damage and a dam was needed to prevent a repeat.

“By installing two 1098 mm diameter Hydro-Brake® Flow Control devices, we can control the water flow to match the maximum capacity of the culvert, without the stored water taking excessive land in a restricted area and country park.”

Alex Stephenson, Stormwater Division director, Hydro International, added: “The Hydro-Brake® Flow Control installation will control the flow, up to a design maximum of 5.7 cu.m/sec, so will protect the culvert and prevent overtopping.

“Above this flow, the stored water will back up behind the dam but the flow characteristic of the devices limits the speed of back-up compared to other forms of flow control, saving in the region of 10-15 per cent of land grab. 
 

Product Showcase

Protecta-Line range grows with new ferrule
 GPS PE Pipe System’s award winning Protecta-Line barrier pipe system has been extended with a unique saddle ferrule.
Comments
Add NewSearch
Only registered users can write comments!
 
Grade 50 Stainless Steel Pump lifting chains with master links
 Bradney Chain has further developed its range of Grade 50 Stainless Steel Pump lifting chains with master links.
Comments
Add NewSearch
Only registered users can write comments!
 
Manhole Buddy
 The newly expanded Manhole Buddy manhole lifter range now provides three alternative solutions for single person cover lifting, all interchangeable on the same multi-function, lifting trolley.
Comments
Add NewSearch
Only registered users can write comments!
 

Login / Register


Username
Password
 Remember me
 
 Lost Password?
  
No account yet? Register

About Water Briefing

Water Briefing is an information service, delivering daily news, company data and product information straight to the desks of purchasers, users and specifiers of equipment and services in the UK water and wastewater industry.