Print this page
Monday, 20 June 2016 09:45

Severn Trent applies for hydo-electric power licence at Howden Reservoir

Severn Trent Water has applied to the Environment Agency for to vary an existing water abstraction licence it holds on Howden Reservoir to include hydro-electric power generation.

The application is to vary licence serial number 03/28/38/0018 which authorises the abstraction of water from Howden Reservoir in the Derwent Valley at National Grid Reference (NGR) SK 17 92

The variation applied for is to include hydro-electric power generation as a purpose of abstraction. All abstracted water will be returned to the same source of supply.