Dwr Cymru Welsh Water has completed its investment scheme to help alleviate the risk of flooding to properties in the Llys Cambria and Coed y Brain areas of Llanbradach.The scheme, which began in March of this year, was designed to increase the capacity of the local wastewater network. Work involved the construction of two new sections of wastewater network to ensure that the system can cope with rainwater run-off during periods of extreme weather which in turn reduces the risk of internal wastewater flooding.Work on the £475,000 scheme took place in Llys Cambria and Coed y Brain and has been completed on time. The work was delivered by Morgan Est plc on behalf of Welsh Water.
Uniwater has acquired Hy-Ram Engineering, a specialist in tooling, products and hire for the water sector, based in Mansfield, England.
Near-real-time microbial monitoring of wastewater discharge and bathing waters is now possible thanks to the BactoSense ID solution created by Swiss-based bNovate Technologies.

Southern Water has released film and images showing what it’s like to walk inside Hampshire’s expanded Yew Hill underground reservoir for the very last time, before it gets filled with water.
Hear how United Utilities is accelerating its investment to reduce spills from storm overflows across the Northwest.