UK Research and Innovation (UKRI) has published a Prior Information Notice notifying interested suppliers of an upcoming supply chain event ahead of going out to tender with a £1.5 million contract for the provision of chilled water and process systems at the Rutherford Appleton Laboratory.

Image: Aerial view Rutherford Appleton Laboratory
Scope of the contract includes management and delivery of design and construction services for the R80 Chilled water and process systems at the Rutherford Appleton Laboratory at Harwell near Oxford.
The laboratory, near Didcot in Oxfordshire, is home to many of the UK’s most advanced research facilities and supports work in a range of areas including space science and astronomy, particle physics, nanotechnology and developing new materials.
The ISIS Neutron and Muon Source is a world-leading centre for research at the Rutherford Appleton Laboratory. The R80 facility houses the Second Target Station (TS2) and its associated neutron beamlines. At the end of each beam line is an instrument hut complete with research instrumentation all of which require a source of suitably graded cold demineralised water.
The successful contractor is required to act as a design and build contractor and will be responsible for all civil, mechanical, electrical construction; installation and commissioning of the following:
- 8 No New Adiabatic coolers (AC’s).
- Connecting pipework and fittings to and the new AC’s within the CDM Works Area
- All types of valves (isolation, regulating, non-return either manual or actuated)
- Commissioning sets and pressure reducing valves
- Testing and drainage points
- Basket and other Filters
- All steel support work for the Adiabatic Coolers
- All pipework supports
- All local electrical power and signal cabling with cable trays etc and supports.
- All necessary civil surveying /setting out work
The contractor will also be entirely responsible for organising the decommissioning and removal of the existing Balticare Cooling Towers within the CDM Works Area.
The aim of the work is to modernize both the chilled and process water circuits.
UKRI has published the PIN is to advise the market of the procurement and to provide details on the planned Market Engagement to be held week commencing 27th June to provide an opportunity for suppliers to find out more about the requirement as well as provide valuable feedback.
Estimated date of publication of the formal contract notice is 18 July 2022. Click here to access the Prior Information Notice
Near-real-time microbial monitoring of wastewater discharge and bathing waters is now possible thanks to the BactoSense ID solution created by Swiss-based bNovate Technologies.
Craig Nienaber, Business Development Manager for Safe Access Solutions (SAS) at HUBER Technology, explores why the company is seeing a growing level of interest in its safe access solutions for critical infrastructure providers, including their application in wastewater treatment assets.

Southern Water has released film and images showing what it’s like to walk inside Hampshire’s expanded Yew Hill underground reservoir for the very last time, before it gets filled with water.
Hear how United Utilities is accelerating its investment to reduce spills from storm overflows across the Northwest.