Mon, Jan 26, 2026
Text Size
Friday, 18 November 2016 12:12

Biwater wins advanced water treatment project contract in California

Biwater have been awarded a contract to design, supply and supervise the installation and commissioning of both ultrafiltration (UF) and reverse osmosis (RO) systems for the Groundwater Reliability Improvement Program (GRIP) advanced water treatment facility being constructed in Pico Rivera, Southern California.

biwater cal contractThe new 14.8 million US gallon per day (56 million litre per day) plant will support the Water Replenishment District (WRD) of Southern California in its aim to be 100 percent independent from imported water. Site work is underway following the recent ground breaking ceremony to meet a completion date of July 2018.

Commenting on the win, Jorg Menningmann, President of Biwater’s Membrane Treatment and Desalination Sector (Biwater Inc.) said:

“Biwater is on track to supply state-of-the-art UF and RO systems by late 2017 for the new GRIP advanced water treatment plant. The membrane systems are two of the three key process technologies essential to the indirect potable reuse solution. Biwater’s membrane technologies will help replenish groundwater supplies to ensure local aquifers are sustainable and continue to be a vital and growing contributor to the region’s water demands,”

The source water for the new GRIP facility is tertiary effluent from two wastewater treatment plants. The 10 train UF process will remove particulates and organisms prior to the RO membranes, thereby contributing to stable RO operation and performance. To enhance overall system recovery rates, backwash waste from the primary UF system will be processed by a subsequent secondary recovery UF system. Overall recovery for the UF system will be 99.7 percent.

Thereafter, the UF filtrate will be treated by four primary RO trains (2 stage) followed by four concentrator RO trains (1 stage) running at a product recovery rate of 92.7 percent. The RO membranes will remove/reduce ionised salts and dissolved organics such as metals, nitrates and total organic content (TOC).

The combined RO product will then be sent through a chemical oxidation/ultraviolet (UV) reactor advanced oxidation process, which will breakdown low molecular weight compounds in the category of Contaminants of Emerging Concern (CECs).

Biwater’s ultimate goal for the pilot plant is to fine tune the operations to reduce energy and chemical consumption and extend useful membrane life. 

News Showcase

Sign up to receive the Waterbriefing newsletter:


Watch

Click here for more...

Login / Register




Forgot login?

New Account Registrations

To register for a new account with Waterbriefing, please contact us via email at waterbriefing@imsbis.org

Existing waterbriefing users - log into the new website using your original username and the new password 'waterbriefing'. You can then change your password once logged in.

Advertise with Waterbriefing

WaterBriefing is the UK’s leading online daily dedicated news and intelligence service for business professionals in the water sector – covering both UK and international issues. Advertise with us for an unrivalled opportunity to place your message in front of key influencers, decision makers and purchasers.

Find out more

About Waterbriefing

Water Briefing is an information service, delivering daily news, company data and product information straight to the desks of purchasers, users and specifiers of equipment and services in the UK water and wastewater industry.


Find out more